YantruOpen demo workspaceTry the demo
For Australian electrical design teams

Scope of work in. Standards-checked SLD out.

Upload the scope or describe the electrical works. Yantru drafts the single line diagram to your client's standards, with the calculations behind it, ready for your engineer to review.

The demo runs in your browser with a fictional project. No sign-up.

Your equipment list becomes a draft drawing

Red: information neededAmber: assumed, needs confirmingBlue: illustrative power flow

Illustration only. Planned checks: access and egress (AS/NZS 3000), assemblies (AS/NZS 61439), cable selection (AS/NZS 3008).

Your client's standards, not ours. Title blocks, symbols, layer names and device rules come from the client's own standard.

Your engineer stays responsible. Every output is a draft for responsible-engineer review. Yantru does not certify compliance.

How it works

Three steps from scope of work to a draft SLD.

  1. Upload the scope

    Drop in the scope of work, equipment list or client emails, or describe the electrical works in a few lines.

  2. Yantru drafts the SLD

    Laid out to your client's drawing standards, with maximum demand, cable sizing and protection checked against AS/NZS 3000, 3008.1.1 and 61439.

  3. Review, then issue

    Missing and assumed values are flagged in red and amber. Close the gaps, then download the drawing, schedules and RFIs for engineering review.

Try it

Edit the equipment below and watch the single line diagram and the missing-information list update.

Equipment list
TagDescriptionkWV

Try changing “VSD” to “DOL” in a description, or clear a kW value.

73 items still needed before this drawing can be issued

All equipment · Hover, focus or tap a row

In the workspace these become RFIs with owners and due dates.

Releases

Released in phases, starting with one job done well.

Later phases are already being built and tested. Each one is switched on only once it holds up on real projects.

  1. Phase 1 · now

    Scope to SLD

    Scope intake, client drawing standards, the single line diagram and the calculations behind it.

  2. Phase 2

    Protection and studies

    Discrimination, fault and arc-flash screens, and PowerCAD/SKM study exchange.

  3. Phase 3

    Switchrooms, earthing and HV

    3D switchroom checks, earthing design, HV cables and switchgear.

  4. Phase 4

    More disciplines and countries

    Mechanical, civil and structural screens, plus New Zealand and other standards packs.

Founding customers

Help shape Phase 1 on your own projects.

For small electrical consultancies and design-and-construct contractors. Founding customers get early access, a say in which client standards come first, and founding pricing when paid plans start.

  • Fully refundable until your first paid month
  • Keep your real project files private: try it on a recent job's scope first
A$99Founding-customer reservation, fully refundable. GST included.Register interestFounding places open shortly. Leave your details below and we'll be in touch.

Feature requests

Tell us what you need; follow approved requests in the build queue.

Area

Roadmap highlights

Phase 1: scope of work to a client-standard SLD.

Protection, studies, switchrooms and other disciplines follow in later phases.

Frequently asked questions

Can I try it without signing in?

Yes. Open the demo workspace with its fictional example project.

Are outputs ready for construction?

Outputs remain drafts until reviewed by a responsible engineer.